Dust test equipment box structure and delivery period

Dust test equipment box structure

1. This dustproof test equipment is made of high-quality materials, processed and formed by the most advanced processing equipment in China, and the surface of the shell is sprayed with plastic, which is beautiful and smooth. Coordinated color matching, circular arc design, smooth and natural lines. The liner is designed to be a closed space at work, where samples can be placed for shell sealing test. It is made of imported high-quality stainless steel plates. The indoor sample rack and other accessories are made of stainless steel plates, which are reasonable in design and durable;

2. The equipment has air flow with vertical circulation of dust, and the test dust can be recycled; the equipment itself has good sealing performance, and the condition of the indoor test can be clearly observed during the test; the equipment is equipped with a vacuum system to meet the needs of the test; The bottom of the device has a dust-replaceable device, and the base is equipped with four movable casters, which is easy to move;

Dustproof test equipment delivery period

1. Delivery period: delivery within 30 working days after receiving the prepayment;

2. Payment method: 50% prepaid, the final payment will be settled after the goods are accepted and accepted;

3. Delivery method: free door-to-door delivery by automobile or consignment;

4. Installation and commissioning: the supplier is responsible for free installation and commissioning, and training 2-5 operators to learn to operate independently;

5. After-sales service: one year warranty, lifetime maintenance, and irregular maintenance every six months.

Hair Serum And Oil

SOLO GLOW HAIR COSMETICS , https://www.arganshampoofactory.com